top of page
Search

Halo Post-Production Placement Diary - 15 to 19th Nov 2021

FLOAT ON RECORDS

Day 1 - 9am to 4pm

Arrive (15 mins early)

Sent to pick-up flowers

Tour of facilities (grading, offline/online rooms etc)

Meet the team (Reception, Runners)

Run through responsibilities (coffee, food, running etc.)

Lunch with Mckenzie (Edit Assistant) & shown the whole production process at Halo.

Afternoon same as morning


Day 2 - 10am to 4pm

Morning: Coffee, breakfast, cleaning etc.

Afternoon: Sit and talk with sound tech and assistants (Tierny and Ben) about post-production workflow - Setting up Pro Tools sessions, sound libraries etc.

Studio sit-in was planned but engineer was too busy. Tierny prepped VO (Voice-Over) session for the next day.


Day 3 - 10am to 4pm

Morning: Coffee, breakfast, cleaning etc.

Afternoon: Studio 5 sit-in - Freegard (Film) dialogue pre-mix. Reel 3 and 4.

Predominately cleaning voice-over vocals.

Fabfilter EQ, De-Essing, De-noising - Automation and resonance control.

Sound Edit assistant set up the tracks, buses and some effects for mix engineer to start working.

Engineer (Son) gave advice on freelance dialogue editing


Day 4 - 10am to 6pm

Morning: Studio 3 (Gerrit) Abominable Snow Baby (ASB) - preparation for final mix (Penteo Upmix)

Levels: -7db & 82 SPL - SA2 & Pro Limiter

Afternoon: Studio 1 ASB - Final Mix in Dolby Atmos

Director run-through & notes - Music dip under narration and Channel 4 Quality Control.

Changes in LFE and in dB levels


Day 5 - 10am to 4am

Whole day: Studio 3 (Gerrit) - Gassed Up dialogue edit (BBC 3)

Auto-Align on multiple vocal channels

Izotope de-noise

Bleeping swearing

Following guide mix (dipping music and narration)

Predominately removing vocal tracks to create space


Goodbyes, emails and numbers when I left.


 
 
 

Comments


Post: Blog2_Post

Subscribe Form

Thanks for submitting!

  • YouTube
  • Instagram
  • Facebook
  • SoundCloud

©2020 by FLOAT ON RECORDS.

bottom of page